Local0:00 AM

/

Coreloops

Product · AI

Coreloops

How twenty spreadsheets became one platform contractors could trust.

Year

2026

Role

Lead Product Designer

Timeline

5 months

Scope

UX · UI · Design system · Webflow build

A UK contractor can run a million-pound job and still find out at month end that it lost money. In July 2026 I joined Coreloops as lead product designer to help change that. Over five months I designed the parts of v2 that people touch every day, and rebuilt the website that sells it.

Visit live site
View Figma prototype

Results at a glance

4 daysAdmin saved every week, A+C Electrical (Coreloops case study)
80+Live projects moved off Eque2, RTB Roofing (Coreloops case study)
3 to 5 hSaved on reporting every week, RTB Roofing (Coreloops case study)

01 — The problem

Picture a quantity surveyor on a rail job. The schedule of works lives in one spreadsheet, valuations in another, and variations, labour and purchasing in five more. Every number gets typed in again and again. Margins are 2 to 25 percent, so one missed overspend can wipe out the job, and it usually shows up at month end, when it’s too late. Coreloops ties every line of the contract to a cost code, so what you charge sits next to what you spend. The hard part was making that power feel simple to people who’ve trusted Excel for twenty years.

02 — My role

I came in as lead product designer, working with the founder, a PM, six engineers and QA. My rule was to start from what’s real. Before designing anything I clicked through the live platform, because old Figma frames drift from what shipped. When a ticket touched a contract, I read the contract. And I reviewed in the open, on calls, in recorded walkthroughs and in Figma comments with the founder, so feedback turned into changes within days.

Constraints

Customers have lived in Excel for twenty years · NEC support needed in about two weeks · Built on shadcn so engineering ships without custom work

01 — A new kind of contractThen the founder had a deadline. Coreloops’ most engaged customer builds rail infrastructure on NEC, the contract behind most UK public work, and was the last one still on the old platform. Coreloops only spoke JCT, and they needed moving over in about two weeks.
The month board

The month board

Reading the contract showed me the real difference. JCT is a list grouped by work section. NEC is a board grouped by month, because you’re only paid for finished activities.

01 — A new kind of contractThen the founder had a deadline. Coreloops’ most engaged customer builds rail infrastructure on NEC, the contract behind most UK public work, and was the last one still on the old platform. Coreloops only spoke JCT, and they needed moving over in about two weeks.
The month board

The month board

Reading the contract showed me the real difference. JCT is a list grouped by work section. NEC is a board grouped by month, because you’re only paid for finished activities.

01 — A new kind of contractThen the founder had a deadline. Coreloops’ most engaged customer builds rail infrastructure on NEC, the contract behind most UK public work, and was the last one still on the old platform. Coreloops only spoke JCT, and they needed moving over in about two weeks.
The month board

The month board

Reading the contract showed me the real difference. JCT is a list grouped by work section. NEC is a board grouped by month, because you’re only paid for finished activities.

Deadlines that count down

Deadlines that count down

A compensation event can run across several months, so every contract deadline counts down in the register.

Key decisionFollow the contract, not the ticket

A quote only counts as accepted by default after the contractor sends a formal reminder. And a change can’t be published into a month that’s already certified, because certified money can’t be quietly reopened.

Deadlines that count down

Deadlines that count down

A compensation event can run across several months, so every contract deadline counts down in the register.

Key decisionFollow the contract, not the ticket

A quote only counts as accepted by default after the contractor sends a formal reminder. And a change can’t be published into a month that’s already certified, because certified money can’t be quietly reopened.

Deadlines that count down

Deadlines that count down

A compensation event can run across several months, so every contract deadline counts down in the register.

Key decisionFollow the contract, not the ticket

A quote only counts as accepted by default after the contractor sends a formal reminder. And a change can’t be published into a month that’s already certified, because certified money can’t be quietly reopened.

The AI does the first draft

The AI does the first draft

Payment applications open with figures the AI suggests, ready for a surveyor to check.

The AI does the first draft

The AI does the first draft

Payment applications open with figures the AI suggests, ready for a surveyor to check.

The AI does the first draft

The AI does the first draft

Payment applications open with figures the AI suggests, ready for a surveyor to check.

Nothing taken on trust

Nothing taken on trust

Surveyors won’t trust a figure they can’t trace, so every number opens the evidence behind it.

Nothing taken on trust

Nothing taken on trust

Surveyors won’t trust a figure they can’t trace, so every number opens the evidence behind it.

Nothing taken on trust

Nothing taken on trust

Surveyors won’t trust a figure they can’t trace, so every number opens the evidence behind it.

By work section

By work section

For teams who still think in JCT, the same schedule reads by work section.

By work section

By work section

For teams who still think in JCT, the same schedule reads by work section.

By work section

By work section

For teams who still think in JCT, the same schedule reads by work section.

From quote to compensation event

From quote to compensation event

A quote becomes a compensation event in a few steps.

From quote to compensation event

From quote to compensation event

A quote becomes a compensation event in a few steps.

From quote to compensation event

From quote to compensation event

A quote becomes a compensation event in a few steps.

02 — Teaching people to trust AIWith NEC live, the next problem was trust. A bill of quantities can run to hundreds of lines, each needing a cost code. The AI could suggest them, but a run left nothing visible, so people either trusted it blindly or ignored it.
Suggestions you can see

Suggestions you can see

Violet chips mark what the AI suggested, a dot shows how sure it is, and accept or reject is one click.

Key decisionMake every AI suggestion visible

A sparkle stays on anything the AI assigned, so you can always tell what it did, and Undo all puts everything back in one click.

02 — Teaching people to trust AIWith NEC live, the next problem was trust. A bill of quantities can run to hundreds of lines, each needing a cost code. The AI could suggest them, but a run left nothing visible, so people either trusted it blindly or ignored it.
Suggestions you can see

Suggestions you can see

Violet chips mark what the AI suggested, a dot shows how sure it is, and accept or reject is one click.

Key decisionMake every AI suggestion visible

A sparkle stays on anything the AI assigned, so you can always tell what it did, and Undo all puts everything back in one click.

02 — Teaching people to trust AIWith NEC live, the next problem was trust. A bill of quantities can run to hundreds of lines, each needing a cost code. The AI could suggest them, but a run left nothing visible, so people either trusted it blindly or ignored it.
Suggestions you can see

Suggestions you can see

Violet chips mark what the AI suggested, a dot shows how sure it is, and accept or reject is one click.

Key decisionMake every AI suggestion visible

A sparkle stays on anything the AI assigned, so you can always tell what it did, and Undo all puts everything back in one click.

One bulk menu

One bulk menu

One action bar where every item is a verb.

One bulk menu

One bulk menu

One action bar where every item is a verb.

One bulk menu

One bulk menu

One action bar where every item is a verb.

Review first

Review first

Before a run, the dialog shows what it will touch and recommends reviewing first.

Review first

Review first

Before a run, the dialog shows what it will touch and recommends reviewing first.

Review first

Review first

Before a run, the dialog shows what it will touch and recommends reviewing first.

03 — Built for glovesThen the people furthest from a desk. Site operatives needed to log their own hours on a phone, often with gloves on. The admin timesheet put days across the top, which on a phone meant one row stretched over seven columns.
Desktop, same model

Desktop, same model

Week list, then week, then day, at every size. On desktop the day opens in a side panel.

Key decisionDays as rows at every size

Days became rows everywhere. Every tap target is at least 44px, and I cut Save draft because each day already saves itself.

03 — Built for glovesThen the people furthest from a desk. Site operatives needed to log their own hours on a phone, often with gloves on. The admin timesheet put days across the top, which on a phone meant one row stretched over seven columns.
Desktop, same model

Desktop, same model

Week list, then week, then day, at every size. On desktop the day opens in a side panel.

Key decisionDays as rows at every size

Days became rows everywhere. Every tap target is at least 44px, and I cut Save draft because each day already saves itself.

03 — Built for glovesThen the people furthest from a desk. Site operatives needed to log their own hours on a phone, often with gloves on. The admin timesheet put days across the top, which on a phone meant one row stretched over seven columns.
Desktop, same model

Desktop, same model

Week list, then week, then day, at every size. On desktop the day opens in a side panel.

Key decisionDays as rows at every size

Days became rows everywhere. Every tap target is at least 44px, and I cut Save draft because each day already saves itself.

The week at a glance

The week at a glance

Every day of the week, one tap away.

The week at a glance

The week at a glance

Every day of the week, one tap away.

The week at a glance

The week at a glance

Every day of the week, one tap away.

One day, two ways in

One day, two ways in

Hours or start and finish times, whichever fits the job.

One day, two ways in

One day, two ways in

Hours or start and finish times, whichever fits the job.

One day, two ways in

One day, two ways in

Hours or start and finish times, whichever fits the job.

What staging taught me

What staging taught me

Watching real use showed someone couldn’t split a day across two projects, so the day became a list of entries.

What staging taught me

What staging taught me

Watching real use showed someone couldn’t split a day across two projects, so the day became a list of entries.

What staging taught me

What staging taught me

Watching real use showed someone couldn’t split a day across two projects, so the day became a list of entries.

04 — One glance, one answerDirectors only want one answer: are we making money on this job? But reports had piled up controls over time, with settings at four levels, and nobody could tell what controlled what.
Saved views, one toolbar

Saved views, one toolbar

Pick a saved view straight from the toolbar, for one project or all of them.

Key decisionRank every control by how often it’s used

The saved view and its filters now sit in one connected toolbar, an always visible filter row separates view filters from inherited settings, and each settings level has one clear behaviour.

04 — One glance, one answerDirectors only want one answer: are we making money on this job? But reports had piled up controls over time, with settings at four levels, and nobody could tell what controlled what.
Saved views, one toolbar

Saved views, one toolbar

Pick a saved view straight from the toolbar, for one project or all of them.

Key decisionRank every control by how often it’s used

The saved view and its filters now sit in one connected toolbar, an always visible filter row separates view filters from inherited settings, and each settings level has one clear behaviour.

04 — One glance, one answerDirectors only want one answer: are we making money on this job? But reports had piled up controls over time, with settings at four levels, and nobody could tell what controlled what.
Saved views, one toolbar

Saved views, one toolbar

Pick a saved view straight from the toolbar, for one project or all of them.

Key decisionRank every control by how often it’s used

The saved view and its filters now sit in one connected toolbar, an always visible filter row separates view filters from inherited settings, and each settings level has one clear behaviour.

Planning before spending

Planning before spending

The cost plan is a month-by-month budget you type straight into.

Planning before spending

Planning before spending

The cost plan is a month-by-month budget you type straight into.

Planning before spending

Planning before spending

The cost plan is a month-by-month budget you type straight into.

Then watch it go out

Then watch it go out

The same plan as cash flow, ready to become purchase orders or labour bookings.

Then watch it go out

Then watch it go out

The same plan as cash flow, ready to become purchase orders or labour bookings.

Then watch it go out

Then watch it go out

The same plan as cash flow, ready to become purchase orders or labour bookings.

05 — Room to growEvery new NEC feature needed a home, and the top bar ran out of room.
One search for everything

One search for everything

Find any record across projects, grouped by type.

05 — Room to growEvery new NEC feature needed a home, and the top bar ran out of room.
One search for everything

One search for everything

Find any record across projects, grouped by type.

05 — Room to growEvery new NEC feature needed a home, and the top bar ran out of room.
One search for everything

One search for everything

Find any record across projects, grouped by type.

A sidebar that folds away

A sidebar that folds away

A collapsible sidebar keeps the project in context.

A sidebar that folds away

A sidebar that folds away

A collapsible sidebar keeps the project in context.

A sidebar that folds away

A sidebar that folds away

A collapsible sidebar keeps the project in context.

Actions where you expect them

Actions where you expect them

Send, certify and invoice now live in one toolbar at the top, never buried at the bottom.

Actions where you expect them

Actions where you expect them

Send, certify and invoice now live in one toolbar at the top, never buried at the bottom.

Actions where you expect them

Actions where you expect them

Send, certify and invoice now live in one toolbar at the top, never buried at the bottom.

06 — A front door to matchLast, the product needed a website that matched it. I rebuilt coreloops.ai natively in Webflow, with no exported code, so the team could keep editing it.
The new homepage

The new homepage

Live in the first week of September, followed by the JCT and NEC4 contract pages, signed off on 7 October.

06 — A front door to matchLast, the product needed a website that matched it. I rebuilt coreloops.ai natively in Webflow, with no exported code, so the team could keep editing it.
The new homepage

The new homepage

Live in the first week of September, followed by the JCT and NEC4 contract pages, signed off on 7 October.

06 — A front door to matchLast, the product needed a website that matched it. I rebuilt coreloops.ai natively in Webflow, with no exported code, so the team could keep editing it.
The new homepage

The new homepage

Live in the first week of September, followed by the JCT and NEC4 contract pages, signed off on 7 October.

04 — The result

The customer saw NEC on staging in mid-September and went live in October. NEC is now one of the two contracts on the Coreloops homepage, and the new reports shipped in November as editable Cost, Resource and Transaction presets.

41Design tickets in five months
10End-to-end NEC contract flows
19Timesheet screens across mobile, tablet and desktop
41Design tickets in five months
10End-to-end NEC contract flows
19Timesheet screens across mobile, tablet and desktop
41Design tickets in five months
10End-to-end NEC contract flows
19Timesheet screens across mobile, tablet and desktop

05 — What I’d do differently

Two lessons I’m keeping. Domain knowledge is design work: my best NEC decisions came from reading the contract, not the ticket. And trust is a UI problem. The AI only became usable once people could see it, judge it, undo it and spot it later.

“Great work on the NEC stuff so far! I can see that you’ve studied the NEC contract and actually understand. With this level of understanding and detail we will move ahead very fast. Super impressed!!”
G
Gabriel
Founder, Coreloops

Next project

Next

See all projects →

Let’s build
something
people love.

Let’s build
something
people love.

Let’s build
something
people love.

30-minute call · Free
I reply within one working day

Social

Start a
project.

Share a few details and I’ll come back with questions, a rough timeline and next steps.

I reply within one working day.

CH 01
000